Page 413 - economic_survey_2021-2022
P. 413

Social Infrastructure and Employment  387


             Pradhan Mantri Gram Sadak Yojana (PMGSY)

             10.91  The primary objective of the PMGSY is to provide connectivity, by way of an all-weather
             road with necessary culverts and cross-drainage structures, which is operable throughout the
             year, to eligible unconnected habitations in rural areas.

             10.92  As on 18.01.2022, a total of 1,82,506 roads measuring 7,82,844 km and 9,456 Long
             Span Bridges (LSBs) have been sanctioned and 1,66,798 roads measuring 6,84,994 km and
             6,404 LSBs have been completed (Figure 17).

             10.93  World Bank (2019) in an evaluation of the scheme found that PMGSY roads had a
             positive impact on human capital formation in rural India. Children in middle or high school
             had 0.7 more years of schooling in 2017; share of babies delivered at home decreased by 30
             percent in connected habitations; vaccination among children under the age of four increased by
             15 percentage points, with boys and girls benefiting equally.

                               Launched
                Scheme                                               Objectives
                               (extended)

              PMGSY-I       2000 (up to       l  To provide connectivity to eligible unconnected habitations
                            Sept, 2022)          with a population of 500+ in plain areas and 250+ in North-
                                                 Eastern and Himalayan states, , Desert areas, Tribal (Schedule
                                                 V) areas and selected tribal and backward districts as identified
                                                 by the Ministry of Home Affairs/ Planning Commission as
                                                 per Census, 2001
                                              l  Additional  relaxation  given  to  connect  habitations  with
                                                 population  of  100-249  (Census  2001)  in  the  Left-wing
                                                 Extremism Affected blocks
              PMGSY-II      2013 (upto        l  Envisaged consolidation of 50,000 Km of existing rural road
                            Sept, 2022)          network.

              RCPLWEA       2016 (up          l  To improve the road connectivity in 44 worst affected LWE
                            to March, 2023)      districts and some adjoining districts in  9 States, viz. Andhra
                                                 Pradesh,  Bihar,  Chhattisgarh,  Jharkhand,  Madhya  Pradesh,
                                                 Maharashtra, Odisha, Telangana and Uttar Pradesh

              PMGSY-III     2019 (up          l  Consolidation  of  1,25,000  Km  existing  through  routes
                            to March, 2025)      and  Major  rural  links  connecting  habitations,  inter-alia,  to
                                                 Gramin Agricultural Markets, Higher Secondary Schools and
                                                 Hospitals.
   408   409   410   411   412   413   414   415   416   417   418